Workday Rescheduled to – March 22nd!

For those that possibly didn’t know, last weeks workday was canceled due to questionable weather. We’ve rescheduled the workday to this coming Saturday, March 22nd. So if you still would like to come out and volunteer at the Bridal Veil Falls trail, Saturday is your chance!

What we’ll be doing: We will be working be working the same area as last month — on the upper part of the Bridal Veil Falls Trail repairing erosion damage and improving erosion control on the railroad bed. Also, before Saturday, we expect to receive approval to start the repair/rebuild effort of the large erosion control structure in that area. It’s been in place over 100 years and has accumulated significant damage. Be sure to bring your own drinking water, sun protection, work gloves and sturdy boots. All tools will be provided. We plan to work until noon.

When/Where: Saturday, March 15,  2014. Meet at 9 am; work until noon.  Meet at the upper trailhead of the Bridal Veil Falls Trail — directions below.  The work area is about 1/2 mile down-trail from that point.

Directions to the Bridal Veil Falls Upper Trail head from Hwy 82 in High Rolls (click this link for a Google map): The Harris Hollow gate is north of High Rolls. From Hwy 82 in High Rolls, turn north at the High Rolls General store onto Cherry Blossom Lane for .3 miles, the west (left) at the stop sign onto Cottage Row. Drive .45 miles and turn north (right) onto Fresnal Canyon Road and travel .9 miles to the upper trailhead on the left. This is also the location of the lower trail head of the Grand View Trail.

If didn’t join us last month and you’ve never been to Bridal Veil Falls, this is another great opportunity!

Thanks!

If you need any additional information, please call 575-434-1949 (ask for Grady) or e-mail nmrailtrails@gmail.com