WHAT WE WILL BE DOING: We will be working the Upper Bridal Veil Falls Trail doing weed control, sealing and cleaning the bridge we built in 2012, and doing erosion control at several places along the trail. Light to heavy work…something for all. As usual, bring water, gloves, sun protection and sturdy shoes.
WHEN: Saturday April 21, 2018, 9 am…work until noon.
WHERE: Bridal Veil Falls Trail Head (T-129) To get there…from the Cherry Festival location in High Rolls, travel North on Fresnel Canyon Rd 0.9 miles to the intersection of the Grandview Lower Trailhead and the Bridal Veil Falls Trailhead.
We will have shirts and caps with the new NM Rails-to-Trails Association logo for purchase.