What we’ll be doing: We will be working be working the same area as last month — on the upper part of the Bridal Veil Falls Trail repairing erosion damage and improving erosion control on the railroad. We were hoping we’d have the necessary wood and hardware to begin rebuilding the large erosion control structure that was object of last work day’s demolition effort. With that in mind we will start construction of a needed new culvert where an original culvert was thought to exist but has since disappeared. We may also do some more trail maintenance in the area. Be sure to bring your own drinking water, sun protection, work gloves and sturdy boots. All tools will be provided. We plan to work until noon.
When/Where: Saturday, April 19, 2014. Meet at 9 am; work until noon. Meet at the upper trail head of the BVF Trail …directions below. The work area is about 1/2 mile down-trail from that point.
Directions to the Bridal Veil Falls Upper Trail head from Hwy 82 in High Rolls (click this link for a Google map): The Harris Hollow gate is north of High Rolls. From Hwy 82 in High Rolls, turn north at the High Rolls General store onto Cherry Blossom Lane for .3 miles, the west (left) at the stop sign onto Cottage Row. Drive .45 miles and turn north (right) onto Fresnal Canyon Road and travel .9 miles to the upper trailhead on the left. This is also the location of the lower trail head of the Grand View Trail.
If didn’t join us over the last couple of months and you’ve never been to Bridal Veil Falls, this is another great opportunity!
Thanks!
If you need any additional information, please call 575-434-1949 (ask for Grady) or e-mail nmrailtrails@gmail.com