WORKDAY PHOTOS APRIL, 2012

April 21, 2012.  We are making great progress on the water crossing at trestle A130.  One gabion is filled. Today we gathered rocks to fill the second gabion.  These two gabions will provide the support for the water crossing.

This slideshow requires JavaScript.

Workday Photos March 17, 2012

Work continues on the trail to join the Bridal Veil Falls Rail Trail with Fresnal Canyon Road.

This slideshow requires JavaScript.

Workday Photos February 25, 2012

Building the water crossing at trestle 130A

This slideshow requires JavaScript.